The Old Baths / High Street
Home / Case Studies / The Old Baths / High Street
Speke, Liverpool

The Old Baths / High Street

Our team was appointed as the principal brickwork contractor on two key affordable housing schemes developed by Legacie Developments.

Client
Legacie / South Liverpool Homes
Project
Affordable housing: 154 residential units across two sites
Work undertaken
Brickwork & blockwork, masonry support, feature brick detailing
Contract value
£1,600,000

Overview

Our team was appointed as the principal brickwork contractor on two key affordable housing schemes developed by Legacie Developments. These flagship projects involved the construction of 154 high-quality residential units, aiming to provide sustainable and affordable housing solutions to meet growing community needs.

Located in South Liverpool, the projects combined modern construction techniques with traditional aesthetics, requiring expert craftsmanship and a reliable delivery partner to execute complex brick and masonry works.

Scope of works

  • Brickwork and blockwork package
  • Installation of masonry support systems
  • Feature brick detailing and architectural finishes
  • Coordination with follow-on trades and structural interfaces

Challenges & solutions

Tight programme requirements

ChallengeThe development had strict timelines due to funding and occupancy schedules.

Our solutionWe deployed a dedicated site management team and increased labour resource during peak phases to maintain progress and ensure continuity across all plots.

Architectural brick detailing

ChallengeThe scheme incorporated several feature brickwork elements including soldier courses, recessed panels, and contrasting bond patterns.

Our solutionOur operatives, trained in high-spec finishing, ensured all details were executed to the architect’s design intent without compromise.

Masonry support integration

ChallengeCoordinating brickwork with structural masonry supports was critical.

Our solutionWe worked closely with the main contractor and structural engineer to ensure all bracketry was installed accurately and in sequence, avoiding delays and rework.

Live environment sensitivities

ChallengeAs part of a phased build in a residential area, site cleanliness, safety, and noise management were top priorities.

Our solutionOur team ensured full compliance with all Considerate Constructors Scheme requirements.

Key achievements

  • Delivered all brick and blockwork to programme and quality standards
  • Zero H&S incidents over the delivery period
  • Seamless integration of bespoke masonry support and façade elements
  • Positive feedback from client and main contractor on workmanship and cooperation
Gallery

On site

6 photos · click to enlarge

Get in touch

Talk to us about your next project